German Pellets Plant
Home   /   Projects   /   German Pellets Plant
12
Feb
The German Pellets plant required a level and solid foundation on which to put over 100 tons of equipment. The Allco team began by leveling the site and adding the plant utilities. Although the size of the site was close to 100 acres, the concrete foundation only covered 3 acres. Within those 3 acres, Allco poured 17,000 cubic yards of concrete and used over 2000 tonnage of rebar.
Project Name: German Pellets Plant
Client: German Pellets
Location: Woodville, Texas
Date: December 2013
Duration: 20 months
Size: 100 Acres
Cost:
A/E Schaumburg & Polk
Delivery Type: CSP