Large waterways create an iconic beachfront development for Laguna Harbor. Allco started the 160 vacation home community by cutting a section of the property connecting the Intercostal canal. A dam was structured while Allco excavated more than 600,000 cubic yards of canals and used the material to elevate the peninsulas from 1 ft to 9 ft above sea level. Concrete plank retaining walls outline the development, while streets, sewer, water, electrical, and telephone lines complete the luxury housing infrastructure.
| Project Name: | Laguna Harbor |
| Client: | Crown Team Texas |
| Location: | Bolivar, Texas |
| Date: | 2007 |
| Duration: | |
| Size: | |
| Cost: | $6.2 million |
| A/E | Aran & Franklin |
| Delivery Type: | Negotiated |