The German Pellets plant required a level and solid foundation on which to put over 100 tons of equipment. The Allco team began by leveling the site and adding the plant utilities. Although the size of the site was close to 100 acres, the concrete foundation only covered 3 acres. Within those 3 acres, Allco …