Constructed one of the region’s largest drainage pump stations through complex heavy civil construction methods including deep excavation, cofferdam construction, piling, structural concrete, bridge access, and installation of large mechanical pumping equipment. The completed facility significantly increased regional flood protection capacity through five 96 inch pumps capable of moving approximately 1.25 million gallons of water per minute.