Constructed a 2000 acre raw water supply and treatment system that combined large scale earthwork with environmental infrastructure to improve regional water resources. The project included construction of levees, canals, sedimentation basins, and water control structures requiring approximately 1.5 million cubic yards of excavation and embankment. The completed system enhances long term water quality and supply through natural treatment processes integrated into a major civil works project.