Installed approximately eight miles of large diameter water transmission main through environmentally sensitive wetlands and challenging right of way conditions. The project included open cut installation, directional drilling, roadway crossings, and deep utility construction while maintaining environmental compliance and delivering reliable water infrastructure for the surrounding communities.