Baptist Surgical Center Renovation
Home   /   Projects   /   Baptist Surgical Center Renovation
12
Feb
The Baptist Surgical Center remained fully operational while Allco renovated the exterior, removing the brick, drywall, windows, and roof. Following strict medical guidelines, the Allco team was required to preserve the interior surgically clean environment while unfastening the old buildings outer material riddled with mildew and bacteria. And if that challenge wasn’t enough, the entire renovation was scheduled to be completed in 21 days! The 23,000 sq. ft. renovation was on the tightest schedule possible and environmental requirements mandated perfection. Allco came to the rescue, and our team met the challenge. The delicate project was completed 2 days ahead of schedule by a well qualified staff with a passion for success.
Project Name: Baptist Surgical Center Renovation
Client: Baptist Hospital
Location: Beaumont, Texas
Date: July 2002
Duration: 19 days
Size: 23,000 sq ft.
Cost: 850,000
A/E LaBiche
Delivery Type: CSP